Weekdays Between Dates Calculator
Count the working days between two dates, excluding weekends and any public holidays you list, with the calendar total alongside.
Everything you type here is processed on your own device. No input is sent to a server, logged, or stored.
What the Weekdays Between Dates Calculator does
This weekdays between dates calculator will count the working days between two dates, excluding weekends and any public holidays you list, with the calendar total alongside. Fill in all 5 fields and the result updates as you type — there is no Calculate button to press and no page reload. It is most often used for working out a delivery or turnaround date in working days. The companion to this one is our day of year converter.
How to use it
- Pick the two dates.
- Choose whether the end date itself counts — contracts and invoices differ on this.
- Enter how many public holidays in the range fall on a working day.
How it works
Counting working days looks like dividing by seven and multiplying by five, and that approximation is wrong by up to two days depending on which day of the week the range starts and ends on. A fortnight from a Monday contains ten working days; the same fourteen calendar days from a Saturday contain ten as well, but from a Thursday it is only nine or ten depending on the end. The only reliable method is to walk the range day by day, which is what this does.
Whether the end date counts is a genuine ambiguity, not a detail. "Within 30 days" in a contract usually means the clock starts the day after the triggering event and the final day counts, giving an inclusive range. "From the 1st to the 15th" in casual speech usually means both ends. Deadlines in regulation are often stated as a number of days from receipt, where the day of receipt itself is day zero. Getting this wrong moves a deadline by a day, which is enough to matter on a notice period or a filing date.
Holidays are entered as a count rather than as dates because the right list depends entirely on where you are, and a tool that shipped one country's calendar would be quietly wrong for everyone else. Look up the holidays that fall inside your range, count the ones landing Monday to Friday — a holiday on a Saturday is already excluded — and enter that number. The weekend definition is adjustable for the same reason: Friday and Saturday is the working week in much of the Middle East.
When to use it
- Working out a delivery or turnaround date in working days.
- Counting the working days in a notice period or a payment term.
- Checking how many working days are left in a project before a deadline.
- Planning cover for an absence across a period containing holidays.
Common mistakes to avoid
- Dividing calendar days by seven and multiplying by five. That is wrong by up to two days depending on the start day.
- Getting the inclusive rule wrong. A contract that says "within 30 days" usually counts the last day and not the first.
- Counting a public holiday that falls on a weekend. It is already excluded.
- Assuming a Saturday-Sunday weekend everywhere. Much of the Middle East works Sunday to Thursday.
Frequently asked questions
Does this include public holidays?
Only if you tell it how many. There is no universal holiday calendar, so the count is yours to supply — and only holidays that fall on a working day should be counted.
Should I include the end date?
It depends on the wording. "Within N days" from an event usually excludes the trigger day and includes the last; a stated range like "the 1st to the 15th" usually includes both. The toggle is there because the answer is not universal.
Why not just divide by seven and multiply by five?
Because the answer depends on which weekday the range starts and ends on. The shortcut is wrong by up to two days, which is enough to miss a deadline.
Can I count a Sunday-only weekend?
Yes. The weekend selector covers Saturday-Sunday, Friday-Saturday, Sunday only and Friday only.