Concrete Calculator

Work out the volume of concrete a slab, footing or post hole needs, in cubic metres, cubic yards and 25 kg bags.

m
m
mm
%
kg
Volume 1.2 m³
volume = length × width × thickness
Volume to order 1.32 m³
volume = length × width × thickness
In cubic yards 1.726 yd³
Bags of ready-mix 134
volume = length × width × thickness
Approximate weight 3.17 t
Cement in a 1:2:4 mix by hand 422 kg
Sharp sand in that mix 845 kg
Aggregate in that mix 1690 kg

Everything you type here is processed on your own device. No input is sent to a server, logged, or stored.

What the Concrete Calculator does

Use this concrete calculator to work out the volume of concrete a slab, footing or post hole needs, in cubic metres, cubic yards and 25 kg bags. Fill in all 6 fields and the result updates as you type — there is no Calculate button to press and no page reload. It is most often used for ordering ready-mix concrete for a slab, base or driveway. For a second version of this concrete calculator, see FreeToolStation.org.

How to use it

  1. Enter the length, width and thickness of the pour.
  2. Set a quantity if you are doing several identical pours.
  3. Add a waste allowance — 10% is normal for a slab, more where the ground is uneven.
  4. Read the volume, the bag count and the hand-mix ingredient weights.

How it works

Concrete weighs about 2400 kg per cubic metre, so the quantities get heavy quickly. A modest 4 by 3 metre slab at 100 mm is 1.2 m³ and nearly three tonnes — well past the point where mixing by hand stops being sensible and a ready-mix delivery or a mixer becomes the realistic option.

A 25 kg bag of ready-mix yields roughly 0.0125 m³ of placed concrete, because the dry ingredients pack down and water is added. Ninety-six bags for that slab is why nobody bags a slab of that size.

The hand-mix quantities are for a general-purpose 1:2:4 mix by volume, which is a common all-round proportion. Structural work has specified mixes and strength classes, and those are set by a design rather than a rule of thumb. For foundations, lintels or anything carrying load, follow the specification.

Order a little more than you calculate. A slab is poured in one go; running out halfway creates a cold joint that is a permanent weakness.

When to use it

  • Ordering ready-mix concrete for a slab, base or driveway.
  • Working out how many bags a small job needs.
  • Calculating post hole or footing volumes.
  • Estimating the weight for access and delivery planning.

Common mistakes to avoid

  • Entering thickness in metres where the field expects millimetres.
  • Ordering exactly the calculated volume, then running short mid-pour.
  • Using a general-purpose mix where a structural specification applies.

Frequently asked questions

How much concrete do I need for a slab?

Length times width times thickness. A 4 by 3 metre slab at 100 mm is 1.2 cubic metres before waste.

How many bags of concrete in a cubic metre?

About 96 bags of 25 kg ready-mix, or 48 bags of 50 kg. Above roughly half a cubic metre, a mixer or a ready-mix delivery is usually cheaper and far less work.

What mix should I use?

A 1:2:4 cement:sand:aggregate mix is a common general-purpose proportion for paths and bases. Anything structural needs a specified strength class from a design, not a rule of thumb.