Concrete Calculator
Work out the volume of concrete a slab, footing or post hole needs, in cubic metres, cubic yards and 25 kg bags.
Everything you type here is processed on your own device. No input is sent to a server, logged, or stored.
What the Concrete Calculator does
Use this concrete calculator to work out the volume of concrete a slab, footing or post hole needs, in cubic metres, cubic yards and 25 kg bags. Fill in all 6 fields and the result updates as you type — there is no Calculate button to press and no page reload. It is most often used for ordering ready-mix concrete for a slab, base or driveway. For a second version of this concrete calculator, see FreeToolStation.org.
How to use it
- Enter the length, width and thickness of the pour.
- Set a quantity if you are doing several identical pours.
- Add a waste allowance — 10% is normal for a slab, more where the ground is uneven.
- Read the volume, the bag count and the hand-mix ingredient weights.
How it works
Concrete weighs about 2400 kg per cubic metre, so the quantities get heavy quickly. A modest 4 by 3 metre slab at 100 mm is 1.2 m³ and nearly three tonnes — well past the point where mixing by hand stops being sensible and a ready-mix delivery or a mixer becomes the realistic option.
A 25 kg bag of ready-mix yields roughly 0.0125 m³ of placed concrete, because the dry ingredients pack down and water is added. Ninety-six bags for that slab is why nobody bags a slab of that size.
The hand-mix quantities are for a general-purpose 1:2:4 mix by volume, which is a common all-round proportion. Structural work has specified mixes and strength classes, and those are set by a design rather than a rule of thumb. For foundations, lintels or anything carrying load, follow the specification.
Order a little more than you calculate. A slab is poured in one go; running out halfway creates a cold joint that is a permanent weakness.
When to use it
- Ordering ready-mix concrete for a slab, base or driveway.
- Working out how many bags a small job needs.
- Calculating post hole or footing volumes.
- Estimating the weight for access and delivery planning.
Common mistakes to avoid
- Entering thickness in metres where the field expects millimetres.
- Ordering exactly the calculated volume, then running short mid-pour.
- Using a general-purpose mix where a structural specification applies.
Frequently asked questions
How much concrete do I need for a slab?
Length times width times thickness. A 4 by 3 metre slab at 100 mm is 1.2 cubic metres before waste.
How many bags of concrete in a cubic metre?
About 96 bags of 25 kg ready-mix, or 48 bags of 50 kg. Above roughly half a cubic metre, a mixer or a ready-mix delivery is usually cheaper and far less work.
What mix should I use?
A 1:2:4 cement:sand:aggregate mix is a common general-purpose proportion for paths and bases. Anything structural needs a specified strength class from a design, not a rule of thumb.