Cubic Yards Calculator

Work out cubic yards from length, width and depth in whatever units you measured, with cubic feet and metres alongside.

%
Cubic yards needed 1.36
cubic yards = length (ft) × width (ft) × depth (ft) ÷ 27
Exact, before waste 1.235
Cubic feet 36.67
Cubic metres 1.038
Typical truck loads 1 at 10 yd³ per load (1.4 yd³ total)
Area covered 100 square feet at the depth you entered

Everything you type here is processed on your own device. No input is sent to a server, logged, or stored.

What the Cubic Yards Calculator does

This cubic yards calculator will work out cubic yards from length, width and depth in whatever units you measured, with cubic feet and metres alongside. Fill in all 6 fields and the result updates as you type — there is no Calculate button to press and no page reload. It is most often used for ordering soil, gravel, mulch or sand by the cubic yard. A related tool on this site is the sand calculator.

How to use it

  1. Enter the length and width, and say which unit you measured them in.
  2. Enter the depth separately — it is nearly always quoted in inches while the answer is in yards.
  3. Add a waste allowance; 10% is usual for loose material and uneven ground.
  4. The cubic yards figure is what a supplier will want when you order.

How it works

A cubic yard is three feet by three feet by three feet, which is 27 cubic feet — and that 27, not 3, is the number to divide by. Dividing by three is the single commonest error in this calculation and it produces an answer nine times too large, which is the kind of mistake you only make once because the delivery arrives.

The reason the mistake is so easy is that depth is almost never measured in the same unit as length and width. A patio is ten feet by ten feet and four inches deep; a flower bed is three metres by two and 15 centimetres deep. This page takes each in its own unit rather than asking you to convert first, because the conversion is where it goes wrong.

The waste allowance is not padding for its own sake. Loose material settles and compacts, ground is never perfectly level, and the last barrow-load always goes further than expected in the wrong direction. Ten per cent is the usual figure for aggregates and soil; for concrete, which cannot be topped up later once it has started to set, fifteen is safer.

The truck-load row assumes ten cubic yards per load, which is a typical tipper. Suppliers vary, and many have a minimum order — often one or two yards — so for a small job the question is sometimes not how much you need but whether bagged material works out cheaper than a part load.

When to use it

  • Ordering soil, gravel, mulch or sand by the cubic yard.
  • Working out how much material a driveway, patio base or raised bed needs.
  • Estimating spoil from an excavation for skip hire.

Common mistakes to avoid

  • Dividing cubic feet by 3 instead of 27, which overstates the answer nine times over.
  • Entering depth in inches while the field expects feet, or the reverse.
  • Ordering the exact figure with no waste allowance and running short on the last stretch.

Frequently asked questions

How many cubic feet in a cubic yard?

27. A yard is three feet, and three cubed is twenty-seven.

How much does a cubic yard cover?

At 4 inches deep, one cubic yard covers about 81 square feet. At 2 inches, about 162.

Should I round up?

Yes. Suppliers sell in whole or half yards, and running short mid-job costs a second delivery charge.