Retaining Wall Block Calculator

Work out how many blocks a retaining wall needs, plus the cap row, the base gravel and the drainage stone behind it.

m
m
mm
mm
mm
The usual rule is one course, or a tenth of the wall height.
mm
mm
mm
%
Blocks needed 161
blocks = ceil(length ÷ block width) × (ceil(height ÷ block height) + buried courses)
Courses, including buried 7
Blocks per course 23
Cap blocks 23
Blocks to order 194
Exposed face area 10.8 m²
Base gravel 0.81 m³
Drainage gravel 3.78 m³
Total gravel 7.34 t
Worth knowing 7 courses including 1 buried, at 23 blocks each, plus a cap row of 23. The buried course is the one people forget, and it is what levels the wall and stops the bottom kicking out. Gravel is quoted as volume and sold by weight; at about 1.6 tonnes per cubic metre this wall needs roughly 7.34 t. Order loose volume slightly over, because it compacts. Drainage is what makes a retaining wall last. Gravel behind the blocks and a perforated pipe at the base let water out; without them, saturated soil pushes with roughly twice the force of drained soil and walls fail from water pressure far more often than from weight.

Everything you type here is processed on your own device. No input is sent to a server, logged, or stored.

What the Retaining Wall Block Calculator does

The retaining wall block calculator on this page will work out how many blocks a retaining wall needs, plus the cap row, the base gravel and the drainage stone behind it. Fill in all 10 fields and the result updates as you type — there is no Calculate button to press and no page reload. It is most often used for ordering blocks and aggregate for a garden retaining wall. We run a second free tools site as well — FreeToolsWorld.org.

How to use it

  1. Enter the wall length and the height you want exposed.
  2. Enter your block dimensions — they vary a lot between systems.
  3. Set the buried courses. One is usual, or a tenth of the wall height for taller walls.
  4. Set the base and drainage gravel to get the aggregate volumes.

How it works

The block count is two multiplications: how many blocks fit along the length, and how many courses make up the height. The part that trips people is the buried courses. A segmental retaining wall starts below the finished grade — one course is the usual minimum, and a tenth of the wall height is the common rule for taller walls — because that buried course is what levels the wall and stops the bottom from kicking outward under load. It is part of the wall and part of the order, and leaving it out is the usual reason a delivery comes up a row short.

The cap row is separate. Most systems sell a cap block with a finished top and no lip, glued down with construction adhesive, and it is one row along the length rather than part of the courses. If your system has no cap, the top course of standard blocks serves instead and you can ignore that figure.

Gravel is the part that decides whether the wall survives, and it is worth more attention than the block count. A compacted gravel base spreads the load and lets the first course be levelled precisely, which every course above depends on. Drainage gravel behind the blocks, with a perforated pipe at the base leading somewhere, is what lets water out of the retained soil. That matters because saturated soil pushes with roughly twice the force of drained soil — walls fail from water pressure far more often than from the weight of earth alone, and a wall built without drainage will bulge and then fail regardless of how well the blocks were laid.

Finally, the height limit. Above about 1.2 metres most jurisdictions require an engineered design and many require consent, because the forces grow with the square of the height and block weight alone stops being enough. Taller walls are built with geogrid — sheets of reinforcement laid between courses and extending back into the retained soil, so the soil mass itself holds the wall. That is a design calculation rather than a block count, and it is not something to estimate.

When to use it

  • Ordering blocks and aggregate for a garden retaining wall.
  • Costing a wall before committing to a block system.
  • Checking a landscaper’s material quantities.
  • Working out the gravel tonnage to have delivered.

Common mistakes to avoid

  • Leaving out the buried course, which is what levels the wall and stops it kicking out.
  • Skipping the drainage gravel and pipe. Water pressure fails more walls than soil weight.
  • Building over about 1.2 m without an engineered design and geogrid.
  • Laying the first course on soil rather than on compacted gravel.
  • Ordering gravel by volume and forgetting it is delivered by weight, and that it compacts.

Frequently asked questions

How many blocks do I need for a retaining wall?

Divide the length by the block face width for blocks per course, and the height by the block height for the number of courses, then add the buried courses and a cap row. Round each division up and add an allowance for cuts.

How many courses should be buried?

At least one, and commonly a tenth of the total wall height for taller walls. The buried course levels the wall and resists the bottom sliding forward.

Do I really need gravel behind the wall?

Yes. Saturated soil pushes roughly twice as hard as drained soil, and drainage failure is the commonest cause of retaining wall collapse. Gravel behind the blocks with a perforated pipe at the base is not optional.

How high can I build without an engineer?

It varies by jurisdiction, but about 1.2 metres is the usual threshold above which an engineered design and often consent are required. Taller walls need geogrid reinforcement into the retained soil.

How much gravel will I need?

This works out the base and drainage volumes in cubic metres and converts at about 1.6 tonnes per cubic metre. Order a little over, because loose gravel compacts.

Related tools

See all home & diy →